ID 724759
Orange County
Owner Reference: 22T04
Bid Date: 11/06/2024 at 10:00am
7 Days until bid date
Trades: Class A - *General Engineering Contractor GEC: Engineering & Infrastructure Building; Opportunities for Subcontractors , C10 - High Voltage Electrical Contractor (HVE): Transmission Lines, Power Lines, Venues, Arenas, Utility, Transformers, C12 - Earthwork & Paving Contractor, Asphalt, Land Clearing, Path & Trail Construction: General Engineering Contractor
The project consists of converting the northbound dedicated right-turn lane on Trabuco into a 4th through/right lane; restriping the southbound #3 through lane on Irvine Boulevard into a through/right lane; adding a second eastbound left-turn lane on Bake Parkway; restoring the second left-turn lane on westbound Bake; and providing a dedicated right-turn lane on eastbound Bake. Bonds required. Prevailing wages.
Nidia Ruelas
Login or create an account
Login or create an account
Owner: City of Lake Forest CA
Published 10/02/2024 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.