ID 733166
Placer County
Bid Date: 01/23/2025 at 02:00pm
50 Days until bid date
Pre-Bid: 12/05/2024 @ 02:00pm
Estimate: $1,850,000
Trades: Class A - *General Engineering Contractor GEC: Engineering & Infrastructure Building; Opportunities for Subcontractors, C34 - Pipeline Contractor: Water Mains, Water Lines, Sewer Lines + Related Structures; Includes Pipe Inspection Camera
This project includes the installation of approximately 2,250 linear feet of 8-inch waterline in Trout Avenue in Kings Beach, CA. The project also includes connections to existing water mains, installation of fire hydrants, customer water services, and pavement restoration. All work is within the Placer County Right of Way. DBE participation requirements Bonds required. Prevailing wages.
Misty Moga
Login or create an account
Login or create an account
Owner: North Tahoe Public Utility District (NTPUD) CA
Published 12/02/2024 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.
This project requires a Good Faith Effort (GFE) outreach. For information regarding Construction Bid Source performing a GFE for you, please call us toll free at 1-888-786-9450