Kitchen Reconfiguration at Rancho Viejo Middle School, Hemet, CA

Riverside County

Owner Reference: FAC2024-19

Bid Date: 11/19/2024 at 04:00pm
20 Days until bid date

Pre-Bid: 11/05/2024 @ 09:00am

Trades: Class B - *General Building Contractor GBC: Building Construction Services; Opportunities for Subcontractors

Bids are requested for a general construction contract, or work described in general, for the following project: FAC2024-19 Kitchen Reconfiguration. Work to include: Demolish and dispose of windows as shown, frame new rough openings to accommodate 3 new hollow metal frames and doors 30’ 70’ patch, and restore finishes to match existing interior and exterior. Provide and install new hollow metal doors and frames with a 2’x 2’ vision light in the doors KD frames will not be allowed, only fully welded 16-gauge frames (match existing). The typical opening schedule and details of the wall frame profile drawings are attached for reference. See the attached schematic for the new layout for reference. Provide backing and electrical for air curtains at each door at two locations. Remove and dispose of existing upper and lower cabinets as shown on the exhibit. Provide and install 2 owner-furnished variable speed air curtains (cut sheet attached). Remove and replace existing lighting new lights are to be RAB Swish 2x4-49N / D10, 4000K replace damaged ceiling tiles as needed, reflected ceiling plan is attached for locations and quantities of lights. Remove and dispose of stainless-steel panels patch walls to receive new paint and FRP. The contractor is responsible for capping and or abandoning utilities as needed after casework is removed. Remove the roll-up door inside room 807 and turn it over to The District, infill opening, and match existing exterior and interior finishes. Remove and dispose of FRP on all walls in serving area room 808. Rearrange electrical to accommodate new food service equipment, refer to the attached equipment schedule and electrical drawings for locations and heights note that there are some ceiling locations. Skim coat or replace drywall as needed and prepare the walls to receive NEW smooth FRP 4’ high, the walls will be prepared to receive paint and texture above the new FRP. Refer to this link for installation instructions https://marlite.com/wp content/uploads/2021/02/FRP-Installation-Instructions-2018-1.pdf. The FRP model will be Marlite S100G WHITE. The walls inside kitchen room 809 are to remain. Rotate the ice machine to match the new layout and adjust plumbing / electrical as necessary. Door Hardware must meet district standards. Please see attached. Foodservice equipment, unless otherwise specified, will be provided by the District. Bonds required. Prevailing wages.

Facilities
 Login or create an account
 Login or create an account

Owner: Hemet Unified School District CA

Published 10/26/2024 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.