EchoWater Facility Chiller Replacement Project, Elk Grove, CA

Sacramento County

Owner Reference: 6031

Bid Date: 10/23/2024 at 11:00am

Pre-Bid: 10/01/2024 @ 01:00pm

Estimate:  $16,078,000

Trades: Class A - *General Engineering Contractor GEC; Subcontractor Opportunities

Project includes demolition of existing chiller equipment and associated auxiliary equipment and accessories; construction of new chillers, associated mechanical equipment piping, accessories in the old blower room of the existing Influent/Effluent Building, installation of new electrical power feed system including outdoor transformers, indoor switchgears and MCCs in the electrical room of the Influent Effluent Building and associated instrumentation controls and architectural and structural improvements. Includes execution of Appendix A, Transformer Procurement Novation Contract, including but not limited to processing shop drawings, and O&M manuals, seismic anchorage calculations, unloading and storage of 07/09/24 Chiller Replacement Project 00 11 13 - 2 equipment, installation of equipment, electrical testing, start-up, and all other work associated with the procurements not included in the procurement contract as work by the transformer Supplier. Note: Estimated contract cost listed herein does not include cost of transformer equipment procurement contract. Cost of the transformers is accounted for a

Gerardo Aguirre
 Login or create an account
 Login or create an account

Owner: Sacramento Area Sewer District / Sac Sewer CA

Published 09/15/2024 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.