Rio Cosumnes Correctional Center Pump Station (S012) Rehabilitation Project, Sacramento, CA

Sacramento County

Owner Reference: 6032

Bid Date: 01/15/2025 at 11:00am
24 Days until bid date

Pre-Bid: 12/04/2024 @ 08:00am

Estimate: $16,760,000

Trades: Class A - *General Engineering Contractor GEC: Engineering & Infrastructure Building; Opportunities for Subcontractors, C42 - Sewer Pump System, Sewer Connection, Septic Tanks & Systems Contractor: OnSite Sewage Facility (OSSF); CIPP liners

The work to be performed under this contract includes the furnishing of all labor, materials, tools and equipment for the Rio Cosumnes Correctional Center Pump Station (S012) Rehabilitation Project. The work generally consists of the following: Modifications to existing pump station facilities including, but not limited to, the replacement of two submersible pumps, two inclined auger screens, two grinders, one standby generator meeting Tier 4 emissions requirements, pump removal crane and frame, wet well cover and access hatch, spot repairs to existing wet well PVC lining, and replacing and relocating the service transformer. Structural modifications will be necessary at both the existing screening structure and wet well to facilitate the new equipment. Construction of an electrical building with a restroom, electrical equipment and instrumentation control systems, valve vaults, flow diversion structure, piping, valves, manholes, mechanical equipment, site improvements, and incoming and outgoing sewer piping and connections. Providing bypass pumping, temporary piping, final piping connections, and sewer flow control during construction and final testing. All work associated with this contract must include, but not be limited to mobilization/demobilization, dewatering of excavation, potholing, sheeting, shoring and bracing of excavation, construction of facilities indicated on the Drawings, traffic control, erosion and sediment control, cleaning, debris removal and disposal, verification of pipe lengths and diameters, sewer flow control, furnishing and installing pipe, inspection and testing, permitting, fencing, site restoration, and such other items or details that are required by the Contract Specifications and Plans and Standard Specifications to be performed, placed, constructed or installed. Bonds required. Prevailing wages.

Terry Lee
 Login or create an account
 Login or create an account

Owner: Sacramento Area Sewer District / Sac Sewer CA

Published 11/25/2024 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.