ID 732606
Sacramento County
Bid Date: 01/15/2025 at 02:00pm
24 Days until bid date
Pre-Bid: 11/25/2024 @ 09:00am
Trades: C57 - Water Well Construction & Waterworks: Drilling, Installation, Improvements & Repairs - General Engineering Contractor, Class A - *General Engineering Contractor GEC: Engineering & Infrastructure Building; Opportunities for Subcontractors
Well improvements for the Ella Way Well Site. Work includes equipping of the drilled well, construction of a building to house well piping, electrical and chemical systems, installation of pipelines and connection to the existing water, storm drain and sanitary sewer systems. The work includes supplying well and injection piping and installation of owner provided submersible pump and motor. The work includes Installation of an owner provided motor control center and switchgear. Work also includes associated electrical controls, SCADA integration, and civil improvements, site walls, gates, paving, grading, and fencing. Class A license required.
Tim Cutler
Login or create an account
Login or create an account
Owner: Citrus Heights Water District (CHWD) CA
Published 11/27/2024 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.