ID 734656
San Benito County
Owner Reference: C2503
Bid Date: 01/08/2025 at 02:00pm
17 Days until bid date
Pre-Bid: 12/02/2024 @ 02:00pm
Trades: Class A - *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors, C42 - Sewer Pump System, Sewer Connection, Septic Tanks & Systems Contractor: OnSite Sewage Facility (OSSF); CIPP liners, Roadway Drainage, Stormwater, Manholes & Valve Boxes, Ditches, Culverts, Shoulder Work, Underdrains, Dewatering, Water Swales
The IWTP portion of this project involves the construction of a new Trash Capture Structure, inlet structure, outlet structure, emergency spillway, improvements to the existing Pond 1 pump station to include a new emergency backup generator, new slide gate division structure and inlet structure to Pond 3, and hardened spillways for Ponds 3, 4 and 5. The Bridge Road portion of this project involves the construction of three (3) new trash capture structures, two (2) flow diversion structure, one (1) flow splitter structure, inlet/outlet pipes, manholes, reconstruction of existing city parking lot on, relocation of an existing city water line, and site solar lighting. Bonds required. Prevailing wages.
Marco Martinez
Login or create an account
Login or create an account
Owner: City of Hollister CA
Published 12/12/2024 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.