Talmadge Improvements 2 , San Diego, CA

San Diego County

Owner Reference: K-25-2353-DB1-3

Bid Date: 11/07/2024 at 02:00pm

Pre-Bid: 10/16/2024 @ 02:00pm

Estimate: $13,600,000

Trades: Class A - *General Engineering Contractor GEC: Engineering & Infrastructure Building; Opportunities for Subcontractors , C34 - Pipeline Contractor: Water Mains, Water Lines, Sewer Lines + Related Structures; Includes Pipe Inspection Camera

This project is comprised of several water facilities. The linear footage of water pipes in this project is approximately 11,000 linear feet (LF) of 8-inch water mains to replace existing asbestos cement (AC) water mains and 345 LF of 8-inch new water mains. Construction will also include fire hydrants, water appurtenances, water main abandonment, street resurfacing and approximately 83 curb ramps. This work includes furnishing all design, labor, materials, equipment, services, and other incidental design, works and appurtenances for the construction of the Project as described in the bridging documents. Bonds required. Prevailing wages.

Ron McMinn
 Login or create an account
 Login or create an account

Owner: City of San Diego CA

Published 09/27/2024 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.

DBE/HUB Outreach

This project requires a Good Faith Effort (GFE) outreach. For information regarding Construction Bid Source performing a GFE for you, please call us toll free at 1-888-786-9450