NEW BID DATE Operations Center Electric Vehicle Charging Infrastructure Project, El Cajon, CA

San Diego County

Owner Reference: CIP #24401

Bid Date: 11/22/2024 at 10:00am

Pre-Bid: 10/30/2024 @ 09:00am

Trades: Class A - *General Engineering Contractor GEC: Engineering & Infrastructure Building; Opportunities for Subcontractors, C10 - High Voltage Electrical Contractor (HVE): Transmission Lines, Power Lines, Venues, Arenas, Utility, Transformers

Helix Water District proposes to implement an integrated, state-of-the-art electric vehicle charging system that will accommodate and support the district’s transition to Zero Emission Vehicles (ZEV) in the coming years. This project includes the construction and installation of approximately: (17) 40 kW DC chargers with 31 dispensers, (22) 180 kW DC Chargers with 48 dispensers, and (2) 640 kW DC Superchargers with 8 dispensers. The project includes the installation of 2 new service connections to SDGE and the entirety of the project will be installed on District-owned property. Bonds required. Prevailing wages.

Joe Garuba
 Login or create an account
 Login or create an account

Owner: Helix Water District (HWD) CA

Published 10/28/2024 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.