Oakland and Harbor Bay Ferry Terminal Modernization Projects, Environmental Review and Permitting Services, San Francisco, CA

San Francisco County

Owner Reference: 24-018

Bid Date: 10/11/2024 at 12:00pm
21 Days until bid date

Pre-Bid: 09/11/2024 @ 11:00am

Trades: *A&E Architecture & Engineering: Professional Services, Consultant, Consulting & Planning Services, Environmental Consulting & Testing, Water & Air Quality & Ecological Compliance & Services, Terminal Charging Infrastructure: Electric Vehicle (EV); Battery Electric Bus (BEB) & Zero Emissions Vessels (ZEV) or Ferries

WETA is implementing plans to transition ferry operations on San Francisco Bay to zero-emissions vessels. This transition requires modernization of ferry terminal facilities with enhanced connections to the local electrical grids. The Harbor Bay Ferry Terminal Modernization Project (Project) is located on Bay Farm Island in Alameda and the Oakland Ferry Terminal Modernization Project (Project) is in Jack London Square in Oakland. The existing ferry terminal components will be removed prior to construction of the modernization project. Feasibility of a temporary terminal facility will be explored during the preliminary engineering phase if the construction is likely to disrupt existing ferry service operations for an extended period. The Project consists of landside and in-water construction. The landside work includes extension of electrical infrastructure from the existing grid to the terminal. Landside work also includes replacement of a landside abutment for terminal access and minor public access improvements. In-water work includes removal of existing steel pipe piles, passenger float and gangway. The in-water work also includes installation of new steel pipe piles, a new passenger float/universal charging float and gangway. The overall in-water footprint of the new facility would result in a net increase. WETA is seeking Environmental Review and Permitting services from qualified individuals or firms (Proposers) for the Project. The firm selected for this work would prepare environmental review documentation in accordance with the California Environmental Quality Act (CEQA) and the National Environmental Policy Act (NEPA). The selected consultant would also assist with environmental resource agency consultations permitting. For detailed information regarding the required Services, please refer to Part B, Scope of Services. The individuals or firms selected pursuant to this RFP (Selected Proposer) will be expected to provide any and all Services in compliance with applicable local, state, and federal laws, rules and regulations.

Keith Stahnke
 Login or create an account
 Login or create an account

Owner: San Francisco Bay Area Water Emergency Transportation Authority (WETA) CA

Published 09/05/2024 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.

DBE/HUB Outreach

This project requires a Good Faith Effort (GFE) outreach. For information regarding Construction Bid Source performing a GFE for you, please call us toll free at 1-888-786-9450