ID 725680
San Francisco County
Owner Reference: 12443
Bid Date: 10/17/2024 at 02:00pm
Pre-Bid: 10/11/2024 @ 11:30am
Estimate: $55,000
Trades: Class A - *General Engineering Contractor GEC: Engineering & Infrastructure Building; Opportunities for Subcontractors , C34 - Pipeline Contractor: Water Mains, Water Lines, Sewer Lines + Related Structures; Includes Pipe Inspection Camera
The sewer repair/replacement location is under the school yard of northeast corner of 22nd Street and Dolores Street. The contractor shall furnish labor and materials to replace an existing 8 inch dia. clay sewer pipe under the above mentioned area; install new 10 inch dia. no hub cast iron pipe; connect one end of the new cast iron pipe upstream to existing clay pipe with new cleanout, connect an existing catch basin (yard sump); and connect the other end downstream to existing sewer pipe under the sidewalk with new riser, house trap and cover outside the existing retaining wall; core drill through 2 existing retaining walls required for the new cast iron pipe penetration; paint the new exposed cast iron pipe to match existing retaining wall color. The length of existing sewer pipe to be replaced is about 35 feet and the depth is about 6-1/2 feet deep.
William Chow
Login or create an account
Login or create an account
Owner: San Francisco Unified School District (SFUSD) CA
Published 10/08/2024 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.