RFP: El Dorado Street Pedestrian and Bicyclist Safety Connectivity, Stockton, CA

San Joaquin County

Owner Reference: WT23039

Bid Date: 10/29/2024 at 03:00pm

Trades: *A&E Architecture & Engineering: Professional Services, Consultant, Consulting & Planning Services

The proposed project shall make all necessary improvements to reduce pedestrian and bicyclist-related collision along South El Dorado Street between Clayton Avenue and Third Street. Improvements include but are not limited to: • RRFB devices • Bulb outs • Bike boxes • ADA ramps • Separated bike lanes • Road diet • Sidewalk, curb and gutter • Streetlights • Upgrade signal hardware • Bicycle video detection • Streetlights • Median refuge islands • Signal phasing modifications • Storm drain improvements Prevailing wages.

Zulema Rodriguez
 Login or create an account
 Login or create an account

Owner: City of Stockton CA

Published 09/15/2024 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.