ID 725352
San Joaquin County
Owner Reference: WT16008
Bid Date: 10/22/2024 at 03:00pm
Trades: Class A - *General Engineering Contractor GEC: Engineering & Infrastructure Building; Opportunities for Subcontractors , C8 - Concrete Contractor: Sidewalks, Curbs, Gutters, Driveways, Handicap ADA Ramps. Pedestrian Improvements, CIP Concrete NIGP 913-47
Design of traffic circle at Rose Street and Commerce Street and Oxford Circle. The work includes installing signage and striping, coring pavement, reducing roadway crown, modifying existing drainage and other utility work, installing streetlight, installing ADA ramps, repairing sidewalk, curb and gutter, and installing traffic circle.
Jiandong Lin
Login or create an account
Login or create an account
Owner: City of Stockton CA
Published 10/07/2024 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.