Progressive Design-Build Services for the Stockton Airport Improvements Project, Stockton, CA

San Joaquin County

Owner Reference: 24-28

Bid Date: 11/22/2024 at 02:00pm
23 Days until bid date

Pre-Bid: 10/30/2024 @ 02:00pm

Trades: *A&E Architecture & Engineering: Professional Services, Consultant, Consulting & Planning Services, Class A - *General Engineering Contractor GEC: Engineering & Infrastructure Building; Opportunities for Subcontractors

The County has a diverse range of goals to complete with its available funding. We have referred to our scope of work as “transformational” because we want to reverse a decadeslong trend of facility deterioration. General aviation facilities to be constructed include: • 36 new T-hangar units (2 sizes) to replace existing • Five new corporate hangars (3,600 sq ft each) • Six aircraft sunshade tie down spaces • One self-serve fuel farm featuring four grades of fuel; one fuel farm (storage) • Associated apron pavement improvements General purpose facilities to be constructed include: • One 1,600 sq ft fire station awning structure (3 sides, no door) • One 8,000 sq ft cold storage building (airport equipment and materials) Airline terminal building facilities to include: • Remodel the entire ticketing, bag claim, restroom, and TSA que areas of the existing terminal. Reuse the existing hold room. Construct a new 30,000 sq ft hold room at grade with toilet rooms and rough concessions (five gates, peak hour capacity of 400 passengers). • Planning for a Customs and Border Protection facility to accommodate 200 passengers (A change order is contemplated during project delivery regarding the design and construction of the customs facility)

Ephraim Cadaing
 Login or create an account
 Login or create an account

Owner: County of San Joaquin CA

Published 10/11/2024 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.