Victor Elementary School Fencing Project, Victor, CA

San Joaquin County

Owner Reference: 0825-8425-330-20

Bid Date: 12/10/2024 at 01:00pm
19 Days until bid date

Pre-Bid: 11/19/2024 @ 10:00am

Trades: C13 - Fencing Contractor: Heavy Fences, Security Gates, Ornamental Iron

Demolishing approximately 600 linear feet of existing fencing and installing about 3,600 linear feet of 7-foot high galvanized fencing with 1’’x9 gauge fabric, along with 105 linear feet of 6-foot high fencing. Existing gate locations will be upgraded to 7 feet, with one gate adjusted from 6 feet, while maintaining existing crash bar assemblies. The installation includes seven man gates with fork latches and four sets of double gates, along with a set of 6-foot high double gates. All measurements must be verified by the contractor, who is also responsible for ensuring the area is USAcompliant. Gates must have a minimum 4-foot opening for ADA compliance, utilize bulldog hinges for bidirectional operation, and follow specific specifications for posts and rails. The project must be completed by July 25th, with a 40-hour work week schedule, and will include a final inspection and area cleanup, along with a manufacturer's warranty and a one-year labor warranty. 3. To bid on this Project, the Bidder is required to possess one or more of the following State of California contractors’ license(s): C13 Bonds required. Prevailing wages.

Maint/Fac Planning/Construction
 Login or create an account

Owner: Lodi Unified School District CA

Published 10/23/2024 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.