Citywide Wharf Fire Hydrant Replacement Project, Santa Maria, CA

Santa Barbara County

Owner Reference: 2024-12

Bid Date: 11/26/2024 at 02:00pm

Pre-Bid: 11/07/2024 @ 10:00am

Estimate: $200,000 - $250,000

Trades: Class A - *General Engineering Contractor GEC: Engineering & Infrastructure Building; Opportunities for Subcontractors

In general, the work consists of removing seventeen (17) substandard fire hydrants and installing six (6) new fire hydrants at four different City locations. All hydrant removals have been coordinated with the Fire Department. Except for existing pavement and cross walk improvements that may be removed or damaged during fire hydrant and waterline upgrade work, no other new subsurface or surface improvements will be constructed, and no grade changes are anticipated. All work will be within the City's road right-of-way. Bonds required. Prevailing wages.

Thomas Korman
 Login or create an account
 Login or create an account

Owner: City of Santa Maria CA

Published 11/04/2024 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.