West Pipeline Inspection & Rehabilitation Project (Phase 1), San Jose, CA

Santa Clara County

Owner Reference: VW0494

Bid Date: 11/06/2024 at 02:00pm
7 Days until bid date

Pre-Bid: 10/09/2024 @ 10:00am

Estimate: $18M - $24M

Trades: Class A - *General Engineering Contractor GEC: Engineering & Infrastructure Building; Opportunities for Subcontractors , C34 - Pipeline Contractor: Water Mains, Water Lines, Sewer Lines + Related Structures; Includes Pipe Inspection Camera

The Project scope includes the following: a. Completely drain and remove all water from West Pipeline and partially drain its distributaries (Santa Clara, Campbell, Sunnyvale, and Mountain View) as shown on the plans and as specified in the specifications. b. Perform work on the treated water transmission pipeline appurtenances sites from the Rinconada Water Treatment Plant to Cox Line Valve (STA 148+44.50). See the Pipeline Maintenance Tables on sheets G-06 through G-08 of the Project drawing Bonds required. Prevailing wages.

Lori Gregory
 Login or create an account
 Login or create an account

Owner: Santa Clara Valley Water District (SCVWD), now Valley Water CA

Published 09/27/2024 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.