City Hall Cooling Tower Fill Media Replacement, Palo Alto, CA

Santa Clara County

Owner Reference: IFB192981

Bid Date: 11/12/2024 at 03:00pm

Pre-Bid: 10/29/2024 @ 10:00am

Trades: C20 - HVAC Contractor: Heating Ventilating Air Conditioning & Controls, Air Handler/Air Chillers. Includes RTU's

Replace the fill media in the Marley NC Series Cooling Tower, located on the 8th floor of City Hall. Isolate and drain the cooling tower, remove and replace the galvanized panels, install new fill media, water nozzles, and change the gearbox oil along with replacing the pinion seals. Reconnect all systems, perform necessary maintenance, and conduct a final inspection to ensure the tower is operational and leak-free. Class C20 - Warm-Air Heating, Ventilating and Air-Conditioning Contractor. Bonds required. Prevailing wages.

Ann Marie Romero
 Login or create an account
 Login or create an account

Owner: City of Palo Alto CA

Published 10/23/2024 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.