ID 731892
Santa Cruz County
Owner Reference: WT-0183
Bid Date: 01/10/2025 at 11:30am
10 Days until bid date
Pre-Bid: 12/10/2024 @ 11:00am
Trades: Class A - *General Engineering Contractor GEC: Engineering & Infrastructure Building; Opportunities for Subcontractors, C34 - Pipeline Contractor: Water Mains, Water Lines, Sewer Lines + Related Structures; Includes Pipe Inspection Camera, C21 - Demolition Contractor, Building Moving, Wrecking & Hauling
Bids will be received for a single prime contract for converting an existing drinking water production well at Beltz 12 into an aquifer storage and recovery (ASR) facility. The Engineer’s estimate anticipates that the total bid price will be $2.8 million and the Contract Time for the completion of all the Work of the Project is 425 days. The proposed Work is generally described as follows: 1. Demolition and modification of the existing production well facility 2. Modification of existing mechanical, piping, electrical, instrumentation, and control systems 3. Installation of new yard piping, electrical conduits, and instrumentation 4. Installation of chemical systems for corrosion control 5. Installation of downhole control valves and new column piping 6. Ancillary improvements in support of the foregoing
Katy Fitzgerald
Login or create an account
Login or create an account
Owner: City of Santa Cruz CA
Published 11/22/2024 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.