ID 734899
Santa Cruz County
Owner Reference: IFB No. WT-0184
Bid Date: 02/07/2025 at 02:00pm
48 Days until bid date
Pre-Bid: 01/14/2025 @ 09:00am
Estimate: $10,125,000
Trades: Class A - *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors, C34 - Pipeline Contractor: Water Mains, Water Lines, Sewer Lines + Related Structures; Includes Pipe Inspection Camera
The City of Santa Cruz Water Department (SCWD) developed the Project to improve the reliability of water supply infrastructure for the City of Santa Cruz (City). The Project is realigning a section of the Newell Creek Pipeline (NCP) in an area with known geological hazards to protect it from future landslide and geological movements. The NCP is a critical component of the City’s water supply infrastructure that transports water from the Loch Lomond Reservoir to the City’s Graham Hill Water Treatment Plant. The Brackney area segment of the NCP has been included in many SCWD risk assessments and is identified in the City’s Local Hazard Mitigation Plan Bonds required. Prevailing wages.
Katy Fitzgerald
Login or create an account
Login or create an account
Owner: City of Santa Cruz CA
Published 12/16/2024 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.