CA-9 Bridges Water Main Replacement Project – Phase I , Boulder Creek, CA

Santa Cruz County

Bid Date: 01/22/2025 at 03:00pm

Trades: Class A - *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors, C34 - Pipeline Contractor: Water Mains, Water Lines, Sewer Lines + Related Structures; Includes Pipe Inspection Camera

Phase I of this project consists of the installation of approximately 550 feet of temporary HDPE potable water main along the existing CA-9 Highway San Lorenzo River Bridge and CA-9 Highway Kings Creek Bridge. The existing water main across each bridge shall be protected in place during construction, and removed/abandoned after both temporary mains have been installed, tested and are ready to receive and convey potable water. This Phase I work is in anticipation of a Caltrans bridge replacement project, which will be completed in two stages. The permanent water main replacement, Phase II, will be bid separately at a later date. SITE OF WORK: Boulder Creek, CA

Lompico County Water District
 Login or create an account

Owner: San Lorenzo Valley Water District (SLVWD) CA

Published 12/23/2024 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.