Cunnison-Tannery Well Site Centralized Water Treatment Plant Pipeline, Capitola, CA

Santa Cruz County

Owner Reference: CWO 23-0101

Bid Date: 02/06/2025 at 02:00pm

Estimate: $1,595,367

Trades: Class A - *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors, C34 - Pipeline Contractor: Water Mains, Water Lines, Sewer Lines + Related Structures; Includes Pipe Inspection Camera

The work includes mobilization/demobilization, excavation, backfilling, paving, shoring, bracing, traffic control, installation of 2,260 LF of 12” C900 PVC, one 2” CAV, one fire hydrant, and CCTV line inspection. Contractor shall possess, as a minimum, a valid California Class A Contractor’s License Bonds required. Prevailing wages.

Connor Pollard
 Login or create an account
 Login or create an account

Owner: Soquel Creek Water District CA

Published 01/03/2025 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.