Buckeye Water Treatment Plant Filters 5 through 8 Repairs, Redding, CA

Shasta County

Owner Reference: 2725

Bid Date: 01/23/2025 at 03:00pm
32 Days until bid date

Estimate: $845,000

Trades: Class A - *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors, Wastewater Treatment Plant/Facility Construction & Repairs WWTP/WRF/OSSF OnSite Sewer, Lift Station

The project includes repair of filters 5 through 8 at the City's Buckeye Water Treatment Plant, located at 11501 Benson Drive, Redding, California, 96001. In general, the work will include removal and replacement of the existing filter porous plate/underdrain systems with new AWI underdrain and air scour systems. Other related and necessary work includes grouting and concrete work to prepare the existing concrete basins for the new underdrain systems, temporarily removing and reusing existing filter media, and improving filter media to meet specified thicknesses. The Contractor shall possess a valid Class A license at the time bid is opened. Bonds required. Prevailing wages.

Kurt Maire
 Login or create an account
 Login or create an account

Owner: City of Redding CA

Published 12/17/2024 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.