ID 728024
Solano County
Bid Date: 11/21/2024 at 02:00pm
Trades: Class A - *General Engineering Contractor GEC: Engineering & Infrastructure Building; Opportunities for Subcontractors , C57 - Water Well Construction & Waterworks: Drilling, Installation, Improvements & Repairs - General Engineering Contractor
The City has identified a possible water well location that is geographically advantageous to the existing water system. The City has negotiated access rights to the site and intends to explore the feasibility of developing a permanent ground water well at the location. To accomplish this task, the City has elected to perform a well test hole drilling project in adherence to the following general parameters: Drilling of an 8”–10 ” test hole to a depth of approximately 800 feet by the direct circulation rotary method Formation sampling of soils encountered to determine the lithology of the test hole location Geophysical logging of the test hole Zone specific water quality sampling of at least 3 probable water producing zones Abandonment of the test hole and site restoration
Greg Malcolm - via email only
Login or create an account
Login or create an account
Owner: City of Rio Vista CA
Published 10/26/2024 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.