Informal Bid - Lebright Parking Lot Paving, Hughson, CA

Stanislaus County

Bid Date: 11/27/2024 at 02:00pm
6 Days until bid date

Pre-Bid: 11/13/2024 @ 10:00am

Trades: C32 - Road Improvements: Pavement Resurface Seal Coat for Highway Roads Bridge Dam Overpass, Runways - NAICS 237310, Class A - *General Engineering Contractor GEC; Subcontractor Opportunities

1) The contractor shall provide all asphalt, concrete, striping and signage, storm drainage including attachment to the street system, parking stops and bollards as shown in the attached drawings. 2) The drawings included in this scope are labeled “LeBright Fields Parking Lot”, sheets 1 through 5. 3) The contractor shall be responsible for calculating the total square footage of asphalt and concrete required to complete this scope. No change orders will be approved due to miscalculations by the winning contractor. 4) The contractor shall be responsible for all traffic control required during the project and the storm drain tie-ins to the street system. 5) The contractor shall be responsible for keeping the street traffic and park activities disruption time to a minimum. This includes keeping access to the restroom/concession building during construction. 6) The contractor shall be responsible for making the transition from the asphalt to the new park walkway next to the continuation school and the Charles St sidewalk, ADA compliant. 7) The contractor shall have 60 calendar days to complete the work after receipt of the contract. Weather delays will be added to that time frame if the City and the contractor agree that work cannot continue under those conditions. 8) The contractor shall be responsible to provide all materials, labor and equipment needed to complete this scope. 9) The contractor understands that all “on-site” labor will be done at prevailing wage rates. The quote must reflect the most recent prevailing wage determination or as amended from time to time: https://www.dir.ca.gov/oprl/dprewagedetermination.htm 10) The contractor shall be responsible for the proper disposal of any project waste including excess soil. 11) The contractor shall be responsible for the protection of any materials or equipment left on site during non-working hours. 12) The contractor shall be responsible for any required building permits and inspections. Permit fees will be waived by the City. 13) The contractor is responsible for any required USA surveys. Any damage, because of not getting a survey, will be the contractor’s sole responsibility. 14) The contractor shall provide their DIR number, proof of insurance and W-9 per City requirements. 15) According to contracting law, the contractor shall provide payment and performance bonds on work totaling $25k or more. 16) There will be a mandatory bid walk at 10:00 on November 13th. Meet at the job site located at the corner of Charles St and Fox Rd. 17) Bids will be due on November 27th at 2:00 p.m. Any bids received after 2:00 will be deemed nonresponsive and will not be considered. Turn bids in either by email or hard copy dropped off at the lobby of City Hall. Email address: wnewlin@hughson.org 18) If you have any questions, please contact Bill Newlin at 209-617-7850 or Jose Vasquez at 209-505-3049. Bonds required. Prevailing wages.

Bill Newlin
 Login or create an account
 Login or create an account

Owner: City of Hughson CA

Published 08/04/2024 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.