Bret Harte S&R Water Mains - Phase 1B (Glenn Ave. & Seattle St.), Modesto, CA

Stanislaus County

Owner Reference: 2025-01

Bid Date: 11/19/2024 at 11:00am

Estimate: $2,254,852.00

Trades: Class A - *General Engineering Contractor GEC: Engineering & Infrastructure Building; Opportunities for Subcontractors , C34 - Pipeline Contractor: Water Mains, Water Lines, Sewer Lines + Related Structures; Includes Pipe Inspection Camera

This project will replace approximately 3,720 LF of aged existing water mains within the Bret Harte Neighborhood. Water main replacement will take place on Butte Ave from Seattle St to Crows Landing Rd; On Seattle St from Butte Ave to Glenn Ave; and on Glenn Ave from Dallas St to Crows Landing Rd. Existing water mains in the area are old, undersized steel mains which are prone to leaking and low pressures. This project will replace the existing system with City standard water mains, valves and fire hydrants to improve system reliability, flows and pressure. The successful bidder must possess a valid Class “A” California Contractor’s License at the time of the award of this contract, to complete the Work as described. Bonds required. Prevailing wages.

Edgar Vargas
 Login or create an account

Owner: City of Modesto CA

Published 10/20/2024 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.