Santa Fe: Fire Alarm Control Panel Replacement Project, Porterville, CA

Tulare County

Owner Reference: 24-067

Bid Date: 12/11/2024 at 10:00am

Pre-Bid: 12/04/2024 @ 02:00pm

Trades: C10 - High Voltage Electrical Contractor (HVE): Transmission Lines, Power Lines, Venues, Arenas, Utility, Transformers, C7 - Low Voltage Electrical Contractor (LVE): Residential Wiring, Telephone/Sound/Cable TV Systems, Fiberoptic, Fiber Optic, Ethernet

The Work includes the removal and replacement of the main fire alarm control panel with a new model Gamewell / FCI panel. All current conduit pathways and wiring will be left in place and re-connected to the new panel, patch & paint (E) wall to match as necessary. The complete fire alarm system to include ALL devices will need to be tested campus wide with a new NFPA-72 submitted upon completion of approved testing. This work to be coordinated with EKC. Bonds required. Prevailing wages.

K Holtermann
 Login or create an account
 Login or create an account

Owner: Porterville Unified School District CA

Published 11/29/2024 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.