ID 726286
Ventura County
Owner Reference: MI 2612, 2023/2024-23
Bid Date: 11/13/2024 at 03:30pm
14 Days until bid date
Pre-Bid: 10/30/2024 @ 01:00pm
Estimate: $75,000
Trades: Class A - *General Engineering Contractor GEC: Engineering & Infrastructure Building; Opportunities for Subcontractors
The work consists of furnishing all labor, materials, tools, equipment, and incidentals as required by the plans (Drawing Number 24-010A, Sheets 1-6), Specifications, and Contract Documents. The general items of work include removal of existing roof perimeter caulking material, preparation of the area where caulking is to be reapplied, installation of backer rod as necessary, installation of replacement caulking material primer and product in accordance with the manufacturer’s recommendations and for the performance of all labor, work, or other operations required for the fulfillment of the Contract in strict accordance with the Contract Documents. The Project is located on the roof of Digesters 1, 2, and 3 at the Hill Canyon Treatment Plant (HCTP). Access to the project site will be from the HCTP access entrance address: 9600 Santa Rosa Road, Camarillo, CA 93012. Bonds required. Prevailing wages.
Nader Heydari
Login or create an account
Login or create an account
Owner: City of Thousand Oaks CA
Published 10/14/2024 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.