*New Bid Date* Santa Paula Creek 2024 Streambank Stabilization Project, Santa Paula, CA

Ventura County

Owner Reference: 82191

Bid Date: 11/21/2024 at 02:00pm

Pre-Bid: 10/30/2024 @ 09:30am

Estimate: $3,360,000

Trades: Class A - *General Engineering Contractor GEC: Engineering & Infrastructure Building; Opportunities for Subcontractors

The work consists of the clearing and grubbing of vegetation within the construction area, the excavation of 2-10’ wide by 2.5’ deep water diversion/pilot channels, approximately 1050’ of total length for both channel. Also included in the project is the reconstruction/ replacement of 7 Spur Dikes constructed from 1-ton angular rock and granular filter material. Spur dike sections each vary from 5’ to 7’ in thickness, 30’ to 40’ in width, with a 5’ top and 2.5:1 side slopes, average 131 LF in length, as shown on the plans. Project also include the import of fill material from a local stockpile. Bonds required. Prevailing wages.

Bidding Questions
 Login or create an account
 Login or create an account

Owner: County of Ventura CA

Published 10/27/2024 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.