ID 734182
Adams County
Owner Reference: IFB-PWU-24-545
Bid Date: 01/09/2025 at 02:00pm
18 Days until bid date
Trades: Water Supply & Irrigation Contractor: Reverse Osmosis (RO) Systems, Landscaping Water Sprinkler System
The purpose of this project is to replace the existing north irrigation pivot system with a new, in-kind irrigator. The specifications of the current system are as follows: • (1) Zimmatic Pivot Irrigation System – 9500 Series Spans • (1) 8” Heavy Duty, Non-Tow Pivot Structure • (1) Standard Duty Non-Tow Anchor • (1) FieldBOSS with 11 wire CR, for standard riser • (1) Auto-shutdown, with auto-reverse (any tower) • (2) Physical Barricade for Auto-SD/Rev • (1) End Tower Light • (1) Pressure Transducer, 0-150# • (3) 8” x 157’, Solid, 15%, Span, 30” Spacing • (2) 6-5/8” x 179’, Solid, 15%, Span, 30” Spacing • (4) 6-5/8” x 157’, Solid, 15%, Span, 30” Spacing • (1) 5-9/16’ x 44’, Overhang, 30” Spacing • (2) 10 AWG, 179’, 11 wire, Span Cable • (7) 10 AWG, 157’, 11 wire, Span Cable • (9) Standard Tower, Swivel • (2) 8’ Joint • (5) 6-5/8” Joint • (1) 8” to 6-5/8” Reduction Joint • (1) 6-5/8”, Last Tower Joint • (7) Standard Tower Box • (1) Next-to-Last Tower Box • (1) Last Tower Box • (9) 20-75 PSI, Multi-Pressure Plug (Red) • (9) Wheels, 11.2 x 38 New w/ Tube, 10” Rim • (9) 43 RPM Lindsay Center Drive • (9) Power Drive, Non-Towable Gearbox • (1) SR100, 130GPM BP, 11’-44’ OH, Aquamatic Valve • (1) Set Up • (1) Drop Sprays • (1) Pad
Whitney Moore
Login or create an account
Login or create an account
Owner: City of Westminster CO
Published 12/10/2024 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.