Safer Signals Safer Streets Traffic Signals Replacement Project, Boulder, CO

Boulder County

Owner Reference: 21-2024

Bid Date: 08/28/2024 at 02:00pm

Pre-Bid: 08/14/2024 @ 02:00pm

Trades: Traffic Signals, Traffic Calming, Control & Monitoring - Electrical & General Engineering Contractor

The work shall consist of the installation of materials and equipment to form complete and operational traffic signal and lighting installations at various locations in the City. A certified IMSA Level II Traffic Signal Electrician shall be required to complete work within controller cabinets. The construction foreman provided by the Contractor shall be a Journeyman rated foreman, (graduate of a traffic signal apprenticeship program recognized by the City), with the following minimum certifications: IMSA Level II Traffic Signal Electrician, IMSA Level II Traffic Signal Construction. IMSA Level III certifications would be preferred. The foreman is expected to be on the work site daily, instructing and supervising apprentices, coordinating construction efforts with other contractors and City staff, and insuring work being completed is done correctly. The Contractor shall be licensed as an Electrical Contractor by the State of Colorado. The successful bidder shall provide a list of qualified employees to the Engineer. The installations shall be complete with all necessary accessories for proper operation. The disconnect devices, protective devices, and all other equipment shall be thoroughly coordinated to secure accordance with these specifications. Traffic signal and lighting plans indicate the extent and general arrangement of the installation. Should the Contractor deem a departure from the plans necessary, details of such departures and the reasons therefore shall be submitted immediately to the Engineer for approval. No such departures shall be made prior to the written approval of the Engineer. Location of materials and equipment shall be as shown on the plans or as directed by the Engineer. The Contractor shall coordinate with the Traffic Signal & Lighting Operations Supervisor for the release of any materials supplied by the City. Due to the Engineer's workload, the Contractor shall coordinate these efforts to be at the start of work shift (7:00 A.M.), unless otherwise approved in advance. The Contractor shall keep all shared or joint use work areas clean and tidy. The Contractor shall be responsible for protecting and maintaining the condition of all traffic signal equipment and/or materials while in their care, until final installation and inspection are complete. The Contractor shall be responsible for the removal of all traffic signal and/or electrical cables, in regard to, traffic signal installations, during the modification of, rebuilding or rewiring of, existing traffic signal installations, or the new installation of a signalized intersection. The Contractor shall gather all removed traffic signal cable materials and return them the signal shop. Bonds required. Prevailing wages.

Roger Cain
 Login or create an account
 Login or create an account

Owner: City of Boulder CO

Published 08/07/2024 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.

DBE/HUB Outreach

This project requires a Good Faith Effort (GFE) outreach. For information regarding Construction Bid Source performing a GFE for you, please call us toll free at 1-888-786-9450