ID 722443
Denver County
Owner Reference: 202475774
Bid Date: 10/24/2024 at 01:00pm
Pre-Bid: 09/24/2024 @ 03:00pm
Trades: Roadway Drainage, Stormwater, Manhole Covers & Valve Boxes, Culverts: Installation, Repair & Removal
The storm drain system improvements in the Marston Lake North Drainageway aim to separate stormwater flows from the Bowles Lateral irrigation ditch, improve drainage and alleviate high groundwater near the properties adjacent to Bowles Lateral at Saratoga Place, and improve the overall drainage and reduce street flow through the project area. The new storm system will collect and convey flows from West Wagon Trail and South Field Way to the existing storm drain system downstream of the Glenbrook Pond. The project was separated into two phases. Phase 1 was competed in 2023 and separated storm flows from the Bowles Lateral with the improvements. Phase 2 will tie into the upstream end of Phase 1 and includes the installation of 30-inch to 42-inch and 34x53-inch elliptical storm main, storm laterals, inlets, and manholes. Waterline adjustments, curb Ramps, curb, gutter, and sidewalk replacement, as well as street restoration are also included. Bonds required. Prevailing wages.
Cheryl Booker
Login or create an account
Login or create an account
Owner: City & County of Denver CO
Published 09/16/2024 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.
This project requires a Good Faith Effort (GFE) outreach. For information regarding Construction Bid Source performing a GFE for you, please call us toll free at 1-888-786-9450