ID 718832
Eagle County
Owner Reference: 2024-014
Bid Date: 09/10/2024 at 07:00pm
Pre-Bid: 08/27/2024 @ 12:00pm
Trades: *A&E Professional Services: Architecture, Engineering, Consultant, Consulting & Planning Services
The Town of Gypsum (Town) is seeking qualified firms to provide professional engineering design of a raw water pump station on an existing intake vault. The vault is located at the confluence of the Eagle River and Gypsum Creek in Gypsum, Colorado - Figure 1. The project aims to enhance the current raw water systems for the Norgaard Water Treatment Plant by utilizing an alternative intake and improve upstream creek health during drought conditions. The selected firm is responsible for performing all mechanical, structural, hydraulic investigations and analysis, as well as any necessary survey work for developing construction estimates and bid documents for all civil work.
Jacob Rivera
Login or create an account
Login or create an account
Owner: Town of Gypsum CO
Published 08/21/2024 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.