North Nevada East Side Stormwater Improvements, Colorado Springs, CO

El Paso County

Owner Reference: R24-128CA

Bid Date: 11/08/2024 at 05:00pm

Pre-Bid: 10/16/2024 @ 05:00pm

Trades: CO-22 - Pipeline Contractor: Water Mains, Water Lines, Sewer Lines + Related Structures; Includes Pipe Inspection Camera

The project consists of installation of a new water main, reconnections of all water services through the area, new storm sewer running down the middle of Stone Ave, new storm inlets, and site restoration of concrete and asphalt. The site location is on Stone Ave between Winters Dr and Fillmore St. Construction is to begin as soon as possible, but is expected to begin early 2025 and the Contractor will have 360 calendar days to complete all construction activities. Bonds required.

Crystal A Abeyta
 Login or create an account
 Login or create an account

Owner: City of Colorado Springs CO

Published 10/14/2024 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.