ID 726490
El Paso County
Owner Reference: R24-128CA
Bid Date: 11/08/2024 at 05:00pm
Pre-Bid: 10/16/2024 @ 05:00pm
Trades: CO-22 - Pipeline Contractor: Water Mains, Water Lines, Sewer Lines + Related Structures; Includes Pipe Inspection Camera
The project consists of installation of a new water main, reconnections of all water services through the area, new storm sewer running down the middle of Stone Ave, new storm inlets, and site restoration of concrete and asphalt. The site location is on Stone Ave between Winters Dr and Fillmore St. Construction is to begin as soon as possible, but is expected to begin early 2025 and the Contractor will have 360 calendar days to complete all construction activities. Bonds required.
Crystal A Abeyta
Login or create an account
Login or create an account
Owner: City of Colorado Springs CO
Published 10/14/2024 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.