Engineering & Design Services f/t Fountain Creek at Hanson Trailhead Improvement, El Paso, CO

El Paso County

Owner Reference: RFP-25-001

Bid Date: 01/08/2025 at 04:00pm
45 Days until bid date

Pre-Bid: 12/02/2024 @ 04:00pm

Trades: *A&E Architecture & Engineering Services: Professional, Consultant, Consulting & Planning Services

El Paso County is soliciting responses for qualified Consultants with experience in drainage analysis and civil design services for the Engineering and Design Services for the Fountain Creek at Hanson Trailhead Improvements Project. The Project scope will include: drainage study and analysis, survey, geotechnical study; alternative analysis, and preliminary and final engineering design. Bonds required. Prevailing wages.

Becky Schaffstein
 Login or create an account
 Login or create an account

Owner: County of El Paso CO

Published 11/20/2024 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.