2024 Pedestrian Safety Project, Fruita, CO

Mesa County

Owner Reference: 2024 - 130 - 110

Bid Date: 08/09/2024 at 03:30pm

Pre-Bid: 08/05/2024 @ 03:30pm

Trades: Hydrodemolition or Hydro-Demolition: Concrete Removal, Hydromilling, Waterblasting, Waterjetting, CO-12 - Concrete Contractor: Sidewalks, Curbs, Gutters, Driveways, Handicap ADA Ramps. Pedestrian Improvements, CIP Concrete NIGP 913-47, CO-01 - *General Engineering Contractor GEC; Subcontractor Opportunities

The project that is the subject of these Instructions consists of the removal of all or portions of certain existing concrete or asphalt trail, curb, gutter, sidewalk, and other improvements, along with the installation of certain new concrete trail, curb, gutter, and sidewalk improvements as well as the installation of certain bulbouts/crosswalk improvements, push-button pedestrian crossing lights, and signage and pavement markings related to the foregoing, at various locations in Fruita. Bonds required.

Chris Dehmel
 Login or create an account

Owner: City of Fruita CO

Published 07/22/2024 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.