Crosby Avenue Utility Relocation, Grand Junction, CO

Mesa County

Owner Reference: IFB-5554-24-DD

Bid Date: 01/21/2025 at 02:00pm
29 Days until bid date

Pre-Bid: 01/06/2025 @ 10:00am

Trades: Municipal & Underground Utility Contractor & Utility Locating Services: GPS, Cabling, Pipes, Power, Telecom, Potholing, Daylight

The Work will include all necessary labor, supervision, equipment, tools and materials for the replacement of the existing AC waterlines, the removal and relocation of the existing ditch, and the rehabilitation of the existing sanitary sewer as indicated in the bid documents. The Work includes but is not limited to: removal of exist road base, asphalt, concrete, AC water pipe, concrete gravity sewer pipe, and appurtenances; removal and resetting of exist landscaping and fences; protection of exist buildings and utility poles; bypass pumping; installation of approximately 1,880 linear feet of PVC waterline pipe (including crossing exist conflicting utilities) and appurtenances; 1,440 linear feet of PIPPVC irrigation pressure pipe; 460 linear feet of PVC pipe sliplined into an existing concrete sewer pipe and manholes; connections to existing distribution and collection systems; asphalt patching; installation of aggregate base course; and completion of all associated site work relating to the project. Bonds required.

Dolly Daniels
 Login or create an account
 Login or create an account

Owner: City of Grand Junction CO

Published 12/17/2024 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.