Miramonte HVAC Design Build RFP, Telluride, CO

San Miguel County

Bid Date: 09/03/2024 at 02:00pm

Pre-Bid: 08/23/2024 @ 10:00am

Trades: HVAC Contractor: Heating Ventilating Air Conditioning & Controls, Air Handler/Air Chillers. Includes RTU's

The work will include the design and installation of a new HVAC high efficiency boiler and involves the following: ● Assessment of the existing air handler ● Assessment of the existing boiler unit ● Assessment of the existing electrical service and determine if its adequate for the new units/equipment to be installed ● Assessment of existing ductwork and cleaning of ductwork, if necessary ● Assessment of controls systems to determine adequacy for new units and equipment installed. ● Assessment and balancing/calibration of forced hot air system after installation and prior to turning over to the County 2 ● Prepare all permitting documents and acquire all permits required for construction (fees will be paid by the County). ● Prepare complete design, construction plans and cost estimates, for the units to be utilized on this project, including more energy efficient equipment options ● Assessment of the existing building access for the new unit to be installed and removal requirements. ● Construct the approved construction plan that will conform to new building and fire codes ● Conduct startup and on-site training with County operations staff ● Provide the County with the manuals ● All prices include control, any modifications to the existing controller, cabinet, wiring or other appurtenances and any new equipment, wiring, labor, etc. to provide a fully functioning HVAC unit. ● The existing system must remain operational at all times during the construction unless directed by the County Project Manager in writing. ● Proposers shall demonstrate experience in the design and installation of projects. Bonds required.

Jarrod Biggs
 Login or create an account
 Login or create an account

Owner: County of San Miguel CO

Published 08/17/2024 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.