2024/2025 Cured In Place Pipe (CIPP) Sewer Rehabilitation Project, Telluride, CO

San Miguel County

Owner Reference: Project Number 6

Bid Date: 10/10/2024 at 05:00pm
20 Days until bid date

Pre-Bid: 09/25/2024 @ 01:00pm

Trades: CO-22 - Pipeline Contractor: Water Mains, Water Lines, Sewer Lines + Related Structures; Includes Pipe Inspection Camera

Installation of approximately 3 miles of cured in place pipe (CIPP) via trenchless rehabilitation methods. Pipe diameters range from 6-inch to 21-inch. Included in the project are hydrophilic end seals at each manhole penetration (subsidiary to pipe lining), the trimming of protruding taps, and a portion of service connections in groundwater shall be laterally lined in coordination with Public Works via an Add Alternate Bid Item. Project award will be evaluated based on price and ability of contractor to meet contract specifications. Bonds required.

Tara Ogren
 Login or create an account
 Login or create an account

Owner: Town of Telluride CO

Published 09/09/2024 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.