Telluride Regional Wastewater Rreatment plant - Dewatering Press System, Town of Telluride

San Miguel County

Owner Reference: 203093

Bid Date: 11/14/2024 at 07:00pm

Trades: Wastewater Operator Certification: Wastewater Treatment Plant Construction & Repairs WWTP/OSSF OnSite Sewer Facilities Lift Stat

Carollo Engineers, Inc. (Engineer), on behalf of the Town of Telluride (Town) is requesting technical and cost proposals from dewatering press system manufacturers, also known as the Vendor, for pre-selection and submittal services for the upcoming Dewatering Redundancy Project. The Town will evaluate and preselect one manufacturer to furnish the redundant dewatering press system for installation at the existing plant. The system will include one volute dewatering press with two dewatering drums, one mixing and flocculation tank, controls, and polymer equipment. The new polymer blending and feed equipment will include a polymer activation and blending chamber, dilution water assembly, solution discharge assembly, system skid, progressive cavity neat polymer metering pump, and electrical junction box. The redundant dewatering press system will be provided by a single Vendor, each of these system components will include all materials to support an operational and functional installation that satisfies the requirements contained in this Request for Proposals (RFP) document and associated Technical Specifications. The Town will contract directly with the pre-selected Vendor to provide submittals and shop drawings for review and approval. Bonds required. Prevailing wages.

Leanne Hyatt, P.E. Carollo Engineers, Inc.
 Login or create an account
 Login or create an account

Owner: Town of Telluride CO

Published 10/30/2024 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.