South Fir Street Pedestrian Bridge Improvements, Telluride, CO

San Miguel County

Owner Reference: 2025-2

Bid Date: 02/14/2025 at 12:00pm
41 Days until bid date

Pre-Bid: 01/15/2025 @ 11:00am

Trades: CO-01 - *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors

The scope of work generally consists of removal and replacement of existing pedestrian bridge decking, handrails, and lighting. Improvements will include approximately 825 SF of Fiber-Reinforced Polymer decking, 146 LF of ADA handrail with integrated down lighting, and rework of landings to connecting trails and pathways. Existing utilities underneath the bridge will need to be protected in place during construction Bonds required.

Justin Blair
 Login or create an account
 Login or create an account

Owner: Town of Telluride CO

Published 12/25/2024 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.