State Highway 60 Waterline Replacement and Extension, Johnstown, CO

Weld County

Owner Reference: ITB-TOJ-01

Bid Date: 09/12/2024 at 06:00pm

Pre-Bid: 09/05/2024 @ 04:00pm

Trades: CO-22 - Pipeline Contractor: Water Mains, Water Lines, Sewer Lines + Related Structures; Includes Pipe Inspection Camera

Furnishing and installing approximately 5,500 LF of 12-inch C900 (DR18) PVC pipeline, 2,500 LF of 8-inchC900 (DR18) PVC pipeline, 12” and 8” fittings, fire hydrants, 3 tunneled railroad crossings, and 1 bored highway and railroad crossing. Work will take place from the intersection of Parish Avenue and SH60 and continue east to the Town’s Central WWTP. Bonds required.

Doug Gossett
 Login or create an account
 Login or create an account

Owner: Town of Johnstown CO

Published 08/26/2024 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.