ID 732587
Tolland County
Owner Reference: 0171-0503
Bid Date: 12/11/2024 at 02:00pm
Estimate: Scope Code "E": $ 1,000,000 to $ 2,499,999
Trades: Tank Services: Installation & Cleaning, Pressure Washing: Fiberglass, Steel or Concrete Tanks - General Engineering Contractor, *General Engineering Contractor GEC: Engineering & Infrastructure Building; Opportunities for Subcontractors
The Project consists of the replacement of the fuel oil storage tank, potable water storage tank, waste water storage tank, and building standby generator and the installation of a diesel exhaust fluid (DEF) aboveground storage tank adjacent to the existing fueling facility on the site of the existing Maintenance Facility on Route 6 in Bolton, Connecticut and the replacement of the oil-water separators on the site of the Interstate 84W Weigh Station in Union, Connecticut. Required Prequalification Work Classification(s): 25A - Vertical Construction - Minor. If a question needs to be asked the day before the bid date, please contact the Contracts Unit staff and email your question to dotcontracts@ct.gov immediately. SBE: 25% Bonds required. Prevailing wages.
Rebecca Buonocore
Login or create an account
Login or create an account
Owner: State of Connecticut Department of Transportation (CTDOT) CT
Published 11/26/2024 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.
This project requires a Good Faith Effort (GFE) outreach. For information regarding Construction Bid Source performing a GFE for you, please call us toll free at 1-888-786-9450