Lift Station #8 Abandonment and Lift Station #7 Upgrade, Newberry, FL

Alachua County

Owner Reference: 2025-01

Bid Date: 12/03/2024 at 02:00pm

Pre-Bid: 11/07/2024 @ 09:00am

Trades: CGC - *General Engineering Contractor GEC: Engineering & Infrastructure Building; Opportunities for Subcontractors , Wastewater Treatment Plant Construction & Repairs WWTP/WRF/OSSF OnSite Sewer Facilities Lift Station

Installation of 456 LF of Wastewater gravity main and two (2) manholes to redirect Lift Station #8 waste flows to Lift Station #7 and abandon Lift Station #8. The work is generally described as furnishing all labor, materials, equipment, tools and services and performing all work necessary to provide the Owner with Construction of new and modified facilities are as shown on the Drawings in the Attachment List of this solicitation. All work should be in accordance with the applicable Construction Drawings, Specifications, and Contract Documents. Bonds required.

Stephanie Puhalla, by email only
 Login or create an account
 Login or create an account

Owner: City of Newberry FL

Published 10/31/2024 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.