Springtree Water Treatment Plant Electrical Upgrades - Phase 2, Sunrise, FL

Broward County

Owner Reference: 24-69-06-CM-0-2024/cm

Bid Date: 09/16/2024 at 02:00pm

Pre-Bid: 08/22/2024 @ 10:00am

Trades: High Voltage Electrical Contractor (HVE): Transmission Lines, Power Lines, Venues, Arenas, Utility, Transformers, CGC - *General Engineering Contractor GEC; Subcontractor Opportunities

Work for this project consists of, but is not limited to, replacement of the existing medium voltage main switchgear and medium voltage motor control centers with new 5kV medium voltage switchgear; Installation of new 5kV generator paralleling and load sharing switchgear and associated controls to parallel the existing generators, synchronize them with each other, and interconnect with the electrical utility; Upgrade of existing standby generator mechanical components and controls; Provision of temporary electrical connections, equipment, and sequencing of electrical work to ensure continuous operation of the facility's electrical system throughout the construction phase; Removal and replacement of three vertical turbine high service pumps, along with associated above-grade discharge piping, and the performance of all labor, work and/or other operations as required for the fulfillment of the Contract in strict accordance with the Contract Documents. Bonds required.

Cheryl McCalla
 Login or create an account
 Login or create an account

Owner: City of Sunrise FL

Published 08/20/2024 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.