Golden Gate Master Pump Station and Site Improvements, Naples, FL

Collier County

Owner Reference: 24-8282

Bid Date: 10/28/2024 at 03:00pm
37 Days until bid date

Pre-Bid: 10/10/2024 @ 10:00am

Estimate:  $3,086,380.00

Trades: CGC - *General Engineering Contractor GEC; Subcontractor Opportunities, Wastewater Treatment Plant Construction & Repairs WWTP/OSSF OnSite Sewer Facilities Lift Station-General Engineering Contractor, Fencing Contractor: Residential & Light Commercial Fences, Concrete Contractor: Sidewalks, Curbs, Gutters, Driveways, Handicap ADA Ramps. Pedestrian Improvements, CIP Concrete NIGP 913-47

In an effort to improve the Collier County wastewater system, the Engineering and Project Management Division (EPMD) is proceeding with the Golden Gate Master Pump Station & Site Improvement Project. This station is located within the Golden Gate Wastewater Treatment Plant at 4931 32nd Ave SW. This phase of construction shall consist of civil site work, underground utility work, and mechanical process piping work. The work includes the installation of all piping, valves, and any other material or component necessary to place the pump station into operation. The Contractor is also required to coordinate all electrical efforts with the County’s procured electrical Contractor (see project Fact Sheet), who is responsible for the installation of all electrical components. The project shall include, but not be limited to: • Removal and reinstallation of chain-link fencing along the perimeter of the facility. • Installation of a new construction trailer. • Installation of a new administration trailer. • Installation of new above grade piping assembly. • Installation of new below grade piping assembly. • Installation of new concrete driveway and concrete pad. • Installation of new No. 57 stone pump pad. All construction shall be in accordance with the construction plans, Collier County Water-Sewer District Utilities Standards Manual, Roadway and Traffic Standards (latest edition), Collier County Development Standards and Specifications, and the State of Florida Department of Transportation (FDOT) standards (latest edition). In the event of conflict between and/or these specifications and drawings, the more stringent requirement shall apply. Bonds required.

Becca Zimmerman
 Login or create an account
 Login or create an account

Owner: County of Collier FL

Published 09/13/2024 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.