North County Regional Water Treatment Plant Nanofiltration System Upgrades, Naples, FL

Collier County

Owner Reference: 24-8279R

Bid Date: 02/27/2025 at 03:00pm
13 Days until bid date

Pre-Bid: 01/29/2025 @ 10:00am

Trades: Wastewater Treatment Plant/Facility Construction & Repairs WWTP/WRF/OSSF OnSite Sewer, Lift Station

This Section covers membrane elements to be supplied by the Membrane Element Installer under contract to Collier County. The installer shall be a membrane system supplier and shall procure, ship, install and startup replacement elements for the first stage of the six (6) existing nanofiltration (NF) membrane trains at the North County Regional Water Treatment Plant (NCRWTP) as specified herein. The membrane element supplier shall be under contract to the installer and shall manufacture and supply the replacement membrane elements. Bonds required.

Matthew Webster
 Login or create an account
 Login or create an account

Owner: County of Collier FL

Published 01/16/2025 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.