Georgia St. Substation Pipe-Type Cable Pothead Replacement, Jacksonville, FL

Duval County

Owner Reference: 1411940246

Bid Date: 03/18/2025 at 12:00pm
3 Days until bid date

Pre-Bid: 02/21/2025 @ 02:00pm

Trades: CGC - *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors, CGC - *General Building Contractor GBC: Building Construction Services, Enclosed Structures; Opportunities for Subcontractors

The Contractor shall provide all labor, equipment, material, and supervision required for construction and final commissioning of the twelve (12) High Pressure Fluid Filled (HPFF) pipe-type cable terminations. The Contractor is responsible under this contract to purchase, inspect, receive, unload, and install all material at the job site. The Contractor will be providing all G&W ATA 139N-HS terminations, shipped to Jacksonville. Prevailing wages.

Jason Behr
 Login or create an account
 Login or create an account

Owner: Jacksonville Electric Authority (Jacksonville Utilities or JEA) FL

Published 02/17/2025 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.