Osceola Country Club Estates Water Main Replacement – Phase 2, Pensacola, FL

Escambia County

Owner Reference: 2024-11

Bid Date: 10/29/2024 at 03:00pm

Pre-Bid: 10/17/2024 @ 10:00am

Estimate: 2,300,000

Trades: CGC - *General Engineering Contractor GEC: Engineering & Infrastructure Building; Opportunities for Subcontractors , Asbestos (ASB), Lead, HAZ Certification: Detection/Remediation Services of Toxic/Contaminants; Remedial Action Plan (RAP), CU - Pipeline Contractor: Water Mains, Water Lines, Sewer Lines + Related Structures; Includes Pipe Inspection Camera

The principal features of the work will consist of the removal from service approximately 10,500 linear feet of cement asbestos water main and approximately 3,000 linear feet of galvanized steel water main. New polyvinyl chloride/ductile iron (PVC/DI) water main will be constructed along roadways located west of Mobile Highway, north of Cherokee Trail, and south of Tonawanda Drive. Bonds required.

Tony Howard
 Login or create an account
 Login or create an account

Owner: Emerald Coast Utilities Authority (ECUA) FL

Published 10/01/2024 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.

DBE/HUB Outreach

This project requires a Good Faith Effort (GFE) outreach. For information regarding Construction Bid Source performing a GFE for you, please call us toll free at 1-888-786-9450