Gull Point Community Center Earth Stabilization Project Phase I, Pensacola, FL

Escambia County

Owner Reference: 25-003

Bid Date: 11/21/2024 at 02:30pm
Bids Today

Pre-Bid: 11/06/2024 @ 10:00am

Trades: CGC - *General Engineering Contractor GEC: Engineering & Infrastructure Building; Opportunities for Subcontractors

This project shall correct an erosion problem caused by a failed concrete storm pipe located inside of Baywoods Gulley. Currently, water does not flow through the pipes and westmost inlet box as designed. Bizarrely, there is a wide crack that runs the length of the pipe into the ditch bottom inlet, compromising the pipe, and potentially creating an unstable void under the pipe. The growth of this void may exacerbate the slope erosion by sucking sand into the pipe and depositing it downstream. Bonds required.

Purchasing Department
 Login or create an account

Owner: City of Pensacola FL

Published 10/24/2024 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.

DBE/HUB Outreach

This project requires a Good Faith Effort (GFE) outreach. For information regarding Construction Bid Source performing a GFE for you, please call us toll free at 1-888-786-9450